Social icon Social icon Social icon

Night Operations

Night Operations Are Approved — But Not Automatically Safe

Most ReOC holders in Australia operate under the CASA 01/17 Night Operations Instrument, which allows drone operations at night subject to specific conditions.

This means that for many operators:
You are already approved to operate at night — but that does not mean you are operationally ready.

Night operations introduce a different risk environment:

  • Reduced visual cues
  • Increased collision risk
  • Challenges in maintaining situational awareness
  • Human factors such as fatigue and reduced perception

Uncrewed Approvals supports operators in developing safe, structured, and defensible night operations capability — not just relying on baseline approval.

What is Covered by CASA 01/17

The CASA 01/17 instrument allows ReOC holders to conduct night operations provided they:

  • Operate within defined conditions
  • Implement appropriate risk controls
  • Ensure personnel are competent
  • Maintain safe separation from hazards and people

It removes the need for a separate approval in many cases — but places responsibility on the operator to ensure operations are conducted safely.

Why Night Operations Require a Structured Approach

Operating at night is not simply daytime operations in lower light.

Key challenges include:

Reduced Situational Awareness

  • Limited visibility of terrain and obstacles
  • Difficulty identifying other airspace users

Human Factors

  • Fatigue
  • Reduced alertness
  • Increased cognitive workload

Visual Limitations

  • Loss of depth perception
  • Reduced ability to judge distance and speed

Environmental Considerations

  • Lighting conditions
  • Weather and visibility
  • Urban vs remote environments

Without a structured approach, these factors can significantly increase operational risk.

What Safe Night Operations Require

To operate safely and defensibly at night, your operation should include:

Operational Procedures

  • Night-specific SOPs
  • Defined operational limits
  • Clear roles and responsibilities

Risk Management

  • Hazard identification specific to night operations
  • Mitigation strategies
  • Emergency procedures

Operational Planning

  • Site assessment
  • Lighting evaluation
  • Airspace considerations

Lighting & Equipment

  • Aircraft lighting appropriate to the operation
  • Ground lighting where required
  • Visibility aids for crew

Crew Competency

  • Training in night operations
  • Understanding of limitations
  • Scenario-based preparedness

Our Approach

We go beyond the regulatory baseline and help you build real operational capability.

1. Operational Review
We assess how you currently conduct (or intend to conduct) night operations.

3. Documentation Update
We update:

  • Operations Manual
  • SOPs
  • Supporting material

2. System Development
We develop:

  • Night-specific procedures
  • Risk controls
  • Operational frameworks

4. Implementation Support
We ensure your procedures are:

  • Practical
  • Usable in the field
  • Aligned with CASA expectations

Night Operations Training (LearnWorlds Course)

Uncrewed Approvals provides a dedicated Night Operations Theory Course through our professional development platform.
This course is designed to:

  • Build operator understanding of night-specific risks
  • Reinforce regulatory requirements
  • Provide practical operational guidance
  • Support Chief Remote Pilot oversight

Course Covers:

  • CASA 01/17 requirements
  • Night operational risk factors
  • Human factors and fatigue
  • Lighting and equipment considerations
  • Operational planning and decision-making

What You Get

  • Structured night operations framework
  • CASA-aligned procedures
  • Updated documentation
  • Improved operational safety
  • Access to formal training through our LMS

Why Uncrewed Approvals

Many operators assume that because night operations are permitted, no further work is required.
This is where risk is introduced.
We bring:

  • Direct experience with CASA approvals and expectations
  • Deep understanding of operational risk
  • Practical, real-world operational design
  • Integrated training and documentation solutions

We help you move from:

“Allowed to operate at night” to “Capable of operating safely at night”

Common Mistakes We See

  • Treating night operations as standard VLOS operations
  • Lack of defined procedures
  • Inadequate risk assessment
  • No formal training or competency framework
  • Over-reliance on aircraft lighting alone

Integrating Night Operations Into Your Capability

Night operations are often part of broader operational capability, including:

  • OONP (urban environments at night)
  • EVLOS operations
  • Emergency and response operations
  • Enterprise workflows

A structured approach ensures safe integration.

FAQ

Do I need a separate approval for night operations?

In many cases, no — CASA 01/17 allows night operations under defined conditions.

Do I still need procedures and training?

Yes. Approval does not remove the requirement to operate safely and competently.

Is lighting alone sufficient?

No. Lighting is only one component of a broader operational system.

Is training required?

While not always explicitly mandated, training is essential to demonstrate competency and manage risk.

Drone in flight

Build Your Night Operations Capability

If you are operating — or planning to operate — at night, it is critical that your procedures and training match the risk.

Structured advice. Regulation-aligned outcomes.