Enabling Scalable, Next-Generation RPAS Capability
Move Beyond Line of Sight. Unlock True Operational Scale.
Beyond Visual Line of Sight (BVLOS) operations represent the next evolution of commercial drone capability.
They enable operations where the aircraft is no longer required to remain within visual observation — allowing for:
- Long-distance missions
- Automated and remote operations
- Large-area coverage
- Scalable, repeatable workflows
Uncrewed Approvals supports operators and organisations in designing, developing, and obtaining BVLOS and remote operations approvals aligned with the expectations of the Civil Aviation Safety Authority.
What is BVLOS?
BVLOS (Beyond Visual Line of Sight) is an advanced operational approval that allows drone operations to be conducted without direct visual observation of the aircraft.
Instead, operations rely on:
- Systems-based situational awareness
- Detect and avoid strategies
- Robust communication links
- Defined operational control frameworks
BVLOS shifts drone operations from pilot-centric to system-centric operations.
What Are Remote Operations?
Remote operations extend the concept of BVLOS further, enabling:
- Centralised control of operations
- Operations conducted over large geographic areas
- Reduced on-site personnel requirements
- Integration into broader operational systems
This is where RPAS transitions into enterprise infrastructure.
What BVLOS Enables
BVLOS and remote operations unlock high-value, large-scale applications:
Linear Infrastructure
- Powerlines
- Pipelines
- Rail corridors
Wide-Area Operations
- Agriculture at scale
- Environmental monitoring
- Land management
Industrial & Enterprise Operations
- Mining and resources
- Asset inspection networks
- Persistent surveillance
Logistics & Emerging Applications
- Delivery concepts
- Remote site support
- Autonomous workflows
The Regulatory Environment
BVLOS operations are assessed under a risk-based regulatory framework.
This requires operators to demonstrate:
- A comprehensive understanding of operational risk
- Appropriate mitigation strategies
- Robust systems and procedures
- A clearly defined Concept of Operations (ConOps)
CASA is progressively evolving its approach, including:
- Broad area approvals
- Standardised operational models
- Increased focus on scalable operations
Key Components of a BVLOS Operation
A BVLOS approval is built on multiple integrated systems:
Operational Design (ConOps)
- Mission profile
- Operational environment
- Airspace considerations
Detect and Avoid (DAA)
- Airspace awareness
- Traffic separation strategies
- Contingency procedures
Command & Control (C2)
- Communication link reliability
- Redundancy and failover systems
Ground Control Systems
- Remote pilot interface
- Monitoring and control systems
Risk Management Framework
- Hazard identification
- Mitigation strategies
- Emergency procedures
Operational Documentation
- Operations Manual updates
- SOPs specific to BVLOS
- Safety case or supporting justification
The BVLOS Approval Process
We provide structured support through each stage of the approval pathway:
Step 1 — Feasibility & Strategy
- Assess operational viability
- Define approval pathway
Step 2 — Concept of Operations (ConOps)
- Develop a clear operational concept
- Define systems and procedures
Step 3 — Risk & Safety Case Development
- Identify hazards
- Develop mitigation strategies
- Build supporting justification
Step 4 — Documentation Development
- Operations Manual updates
- SOPs
- Supporting material
Step 5 — CASA Engagement
- Submission and interaction with CASA
- Iteration and refinement
Step 6 — Approval & Implementation
- Final approval
- Operational integration
What You Get
- Structured BVLOS operational framework
- ConOps development
- Risk and safety case support
- CASA-aligned documentation
- Strategic guidance through the approval process
- Practical implementation support
Why Uncrewed Approvals
BVLOS is not a template-based approval — it is a designed operational system.
We bring:
- Direct regulatory experience as a CASA delegate
- Deep understanding of complex RPAS operations
- Experience across multiple industries
- A focus on practical, scalable solutions
We don’t just prepare documentation — we help you design an operation that can actually be approved and operated.
From EVLOS to BVLOS
For most operators, BVLOS is not the starting point — it is the next step.
A typical progression:
- ReOC → EVLOS → Controlled Airspace → BVLOS
We support operators through each stage to ensure:
- Capability builds progressively
- Risk is managed appropriately
- Approvals are achievable
FAQ
Is BVLOS difficult to obtain?
BVLOS approvals are complex and require a structured, well-designed approach.
Do I need EVLOS before BVLOS?
Not always, but EVLOS provides a strong operational foundation.
How long does BVLOS approval take?
Timeframes vary significantly depending on complexity and readiness.
Can BVLOS be scaled across multiple locations?
Yes — particularly under emerging broad area approval models.
Start Your BVLOS Strategy
If you are planning to move into BVLOS or remote operations, the first step is defining a clear, achievable operational concept.